1:- General Motors - Motor Show 2007 - Dubai
 |
 |
|
An insight into the what happens during the build-up of the major show.
On site Electro staff numbered 110 men per shift - 2 shift per day - and just 4 days to build up.
Total area 2,800 sq.m.
Area devided by main brands, Chevrolet, Hummer, Cadillac, Saab and GMC.
Special ramps were costructed for press day to enable a car "Fashion Show". These was dismantled in just 3 hours for day 2 of the event.
Ceiling truss with fabric to cover whole area.
Installation of 6 car turntables.
Specially
elevated and curved walls clad in steel and glass.
To see completed project given below |
 |
 |
| Completed Project |
 |
 |
 |
 |
 |
 |
2:- Nakheel - Arabian Travel Market 2008 - Dubai
|
 |
 |
|
Designed by Pulse Group, London the Nakheel Stand was a challenging project.
With just 58 days for production including all engineering drawings and sourcing of materials - We were helped by our jeddah HQ for steel; work, and our sign- age factory in Dubai.
Total stand area 1024 sq.m.
Main features:
- 9.5 Meter hexagoneal double deck with a 13m diameter, with a bruch laminated cladding.
- Hexagonal windows 5m across.
- 2 reef over 21m with faceted glass balustrades and inclined walkways.
- Stage withspecial flooring and Theatre Seating for over 40. with a TV studio area for live pofcasts.
- High level VIP lounge inside tower and a further lounge above a reef at 3m.
- 7m high model of a killer whale.
- All internal workrooms, changing rooms and storage beneath the reefs.
|
 |
 |
|
Completed Project
|
 |
 |
 |
1.Reef, Lounge above and reception counter with inbuilt fountain. 2.In forground part of the theatre, and the hexagonal tower. 3.Tower/graphics 4.Inner reef facade with all graphics produced by Electro inhouse. 5.Small lower seating area 6.counter 7.The whale, dancefloor and second reef.
|
 |
 |
 |
| |
|
|
|
|
|

|
|